期刊文献+

通信局房电源区域规划建设研究 被引量:1

The Research on Region Planning and Construction of Power-Building for Telecom Station
下载PDF
导出
摘要 为解决通信局房传统电源建设模式存在的资源浪费等问题,通过调查研究,文章提出了电源区域规划建设模式。该模式结合传统电源建设模式,解决了电源设备利用率不高问题,达到节能、节约设备投资和节约机房面积的效果,同时其符合电源建设安全性和可扩展性原则,可应用于通信局房的电源规划和动力资源优化建设。 To address the issue that the resources waste in the traditional construction mode of power-building for telecorn station, a new planning and construction mode is presented. The new model combines the traditional power-building model, solves the problem that power equipment's low-use efficiency, and also can save energy, investment in equipment and room space. The new model meets the principle of powe-building security and scalability, and can be applied to power- building planning and optimal construction of power resources for telecom station.
出处 《通信电源技术》 2010年第2期62-65,共4页 Telecom Power Technology
关键词 通信机房 电源规划建设 区域规划 节约设备投资 节约机房面积 telecom station power-building region planning save investment in equipment save room spaee
  • 相关文献

同被引文献4

引证文献1

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部