长江委三峡一期工程建设监理的实践

Supervision by CWRC over Phase-I Works
下载PDF
导出
摘要 长江水利委员会承担了三峡右岸一期工程及左岸部分工程建设监理,监理工程承建合同总价33.7亿元。由100余名监理工程师组成的长江委三峡工程建设监理部在项目实施过程中,建立了一套规范化管理体系和方法,并通过建设监理的实践不断完善和健全,取得显著成效。通过4年来工程建设各方的密切协作与共同努力,工程建设的工期、质量、造价均得到有效控制。 The Construction Supervision Office for the Three Gorges Project, Changjiang Water Resources Commission (CWRC), as the Engineer, undertook the construction supervision over the phase - I works on the right bank and part of phase - I works on the left bank, with a total contract price of RMB 3. 37 billion. During the construction of the works, the Construction Supervision of fice consisting of more than 100 supervisory engineers, has created a series of standardized management systems and methods that have been improved and perfected gradually, and has made remarkable effects. The time schedule, quality and costs for the construction of the Three GorgesProject were effectively controlled in common effort and close cooperation of parties taking part in the construction of the Three Gorges Project.
作者 杨浦生
出处 《中国三峡建设》 1998年第10期14-17,93,共4页 China Three Gorges Construction
关键词 长江三峡 一期工程 建设监理 三峡工程 Three Gorges project Phase-I works Construction Supervision practice
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部