根据一大型冶金工程建设实践,介绍了采用三级编码技术对设计进度实施控制,对高级编码系统的构成、编码约定及控制实施分别加以说明,使整个设计系统的可控性大为提高。
Coding techniques using three pairs of a large-scale metallurgical progress of the implementation ofproj ects designed to control not only improve the progress of the project design level of control to fully meet the project schedule requirements, but also accelerate the professional design of the operation of sub-items of progress, so that the whole designed to greatly improve the controllabilityofthe system.
出处
《工程建设与设计》
2010年第4期126-128,共3页
Construction & Design for Engineering
关键词
工程项目
设计进度
三级编码
projects
design progress
three-level coding