摘要
结合秦岭电厂三灰场工程建设实践,介绍了粉煤灰水力冲填筑坝现场试验成果、水力冲填施工工艺和施工质量控制方法,指出粉煤灰水力冲填筑坝在技术上可行、经济上合理,且有利于减轻施工过程中的灰尘飞扬,改善灰场周边环境条件。
Abstract Combined with construction practice of No 3 coal ash lagoon in QinLing power plant, field test achievement、construction workmanship and quality control method on hydraulic filling dam with coal ash are recommended in this paper. It points out it is feasible technique、reasonable economy and advantageous to lessen dust rising during construction and to improve coal ash lagoon environment condition using coal ash to build a dam with hydraulic filling method.