结合包西铁路通道陕西段制梁场及几座大桥的施工实际,介绍了冬期施工混凝土拌和物热工计算的原理及操作要点。
According to the construction case on precast beam yard and several bridges of Baotou-Xi' an railway in Shaanxi Province, this paper introduces the principles and main operation points of thermal engineering calculation about construction concrete mixture in winter.
出处
《铁道建筑技术》
2010年第3期144-146,共3页
Railway Construction Technology
关键词
冬期施工
混凝土
热工计算
construction in winter
concrete
thermal engineering calculation