5[3]Tarek M.Zayed,and Luh-Maan."Prototype Model for BuildOperate-Transfer Risk Assessm-ent".Journal of Management in Engineering.2002.7 (1),7-16.
6邢国江.建设项目评价中非财务方面风险因素分析评价框架(上),(下)[J].综合评述,2002,.
7[7]Shou QingWang,Robert L.K.Tiong,S.K.Ting,andD.Ashley."Evaluation and Management ofPoliticalin China's BOT Pro jects".Journal of Construction Engineering and Managem-ent.2000.7(5):242-250.
8[8]Darrin Grimsey,and Mervyn K.Lewis."Evaluating the Risks of Pubic Private Partnerships for Infrastructure Projects".Interna tional Journal of Proj-ect Management.2002.20:10 7-118.
9[9]Ryuji Kakimoto,and Prianka N.Seneviratne."Investment Risk Analysis in Port Infrastruct-ure Appraisal".Journal of Infrastruc ture Systems.2000(12):123-129.