地下室超前止水后浇带混凝土渗漏问题的防治 被引量:3

Prevention and Cure of Basement Impermeability by Sealing up Concrete ahead of Post-cast Strip
下载PDF
导出
摘要 结合工程实例,介绍了地下室超前止水后浇带混凝土抗渗漏的一些有效做法,如在基础底板后浇带未浇筑混凝土之前,在后浇带处以下采用混凝土挡板超前止水,提前做好基础底板的止水结构;在地下室墙板后浇带浇筑混凝土之前,将后浇带处外侧止水挡板外侧与地下室外墙模板一体施工等。 According to project practice, the method of strengthen the impermeability of the basement concrete ahead of postcast strip is introduced, such as some effective in the foundation slab post-cast strip, before pouring the concrete without the postpouring belt in advance by concrete flap under water, ahead of the foundation slab water structure, In the basement of post-cast strip casting concrete panels before post-cast strip place outside the water with baffle basement wall template integrated construction, etc.
作者 葛杰 杨朱建
出处 《工程质量》 2010年第3期34-36,共3页 Construction Quality
关键词 后浇带 超前止水 抗渗 post-cast strip ahead sealing up impermeability
  • 相关文献

参考文献1

  • 1中国建筑工业出版社.现行建筑施工规范大全[M].北京中国建筑工业出版社,2005.

同被引文献11

引证文献3

二级引证文献7

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部