期刊文献+

华东核心网架中长期发展模式 被引量:5

Development pattern of medium and long-term for core network in East China Power Grid
下载PDF
导出
摘要 华东电网将逐步发展为多特高压交直流输入、交直流并列运行的特大型受端电网,现有500kV电网的发展模式将发生较大变化。根据华东电网的特点以及规划特高压落点的布局,对华东电网进行板块划分,通过对电网的供电安全分析和短路电流计算,研究板块之间的相互联系模式及短路电流控制措施,从而明确未来华东500kV电网的功能定位及与特高压电网协调发展的运行模式。 East China Power Grid will be gradually developed into a large receiving power grid with muhi-UHV AC and DC input, AC and DC parallel operation. The existing 500 kV power grid development pattern will have great changes. Based on the characteristics of East China Power Grid, as well as UHV site layout, division of the East China Power Grid to several part, and through the security analysis and short-circuit current calculation, the interconnections between those part and the measures for short-circuit current control were studied, and the development pattern was envisaged for East China Power Grid after UHV power grid put into operation.
出处 《中国电力》 CSCD 北大核心 2010年第4期5-8,共4页 Electric Power
关键词 交流特高压 供电安全 短路电流 核心网架 UHV AC security of power supply short-circuit current core network
  • 相关文献

参考文献3

  • 1国家电网规划设计工作组.国家电网总体规划设计[R].北京,2008.
  • 2华东电网有限公司.华东电网“十二五”规划设计[R].上海,2008.
  • 3何大愚.应用智能网络技术构建未来自愈型输电网.动力与电气工程师,2008,(3):12-16.

共引文献3

同被引文献35

引证文献5

二级引证文献26

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部