期刊文献+

核电厂取水明渠泥沙回淤分析 被引量:4

ANALYZING ON THE SEDIMENT ACCUMULATION IN THE INTAKE OPEN CHANNEL OF NUCLEAR POWER STATION
下载PDF
导出
摘要 核电厂需用大量冷却水,用水量为工业用水的第一位。明渠取水是核电厂常用的取水方式之一。本文针对电厂取水明渠及口门外水流特点,分析计算了取水明渠内各部位及口门外过渡段的泥沙回淤率,并提出减少明渠泥沙回淤量的措施。 A large quantity of cooling water, which ranks the first in the industrial water, is needed by nuclear power station. It is one of the conventional methods for thenuclear power station to use open channel to intake water. This paper, according to theflow characteristics outside the intake open channel and at the mouth of the nuclearpowder station, a measure to reduce the back-silting quantity of the sediment in the openchannel is presented through the analyzing and computing of the rate of back siltingofsediment in the crossing reach outside the mouth and each part of the channel.
作者 徐啸
出处 《海岸工程》 1998年第4期5-12,共8页 Coastal Engineering
关键词 核电站 取水明渠 泥沙 回淤率 nuclear power station intake open channel rate of accumulation tidalflow
  • 相关文献

参考文献3

共引文献35

同被引文献18

引证文献4

二级引证文献36

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部