“二牵n”张力放线工艺在±800kV向上线路的应用 被引量:10

Application of "2-pulling n-wire" Stringing under Tension Technology in±800kV Xiang-Shang Transmission Line
原文传递
导出
摘要 介绍了"二牵n"张力放线施工工艺的思路及其在±800kV向上直流输电线路上的应用。此工艺是利用2台牵引机通过特制"二牵n"牵引走板实现一次牵放一相(极)多根大截面分裂导线,解决了多个放线滑车悬挂问题及同相(极)多个放线滑车紧线时滑车迈步及子导线弧垂不一致等问题。另外,提出了施工过程中应该注意的问题。 The paper describes the "2-pulling n-wire" stringing under tension construction technology and its application in ± 800 kV DC transmission line.The technology uses 2 tractors to pull one-phase (pole) large sectional multiple bundle conductors once through a special made "2-pulling n-wire" walking board,which has solved issues like suspension of many stringing pulleys,pulley steps for same-phase (pole) multiple-stringing pulley tightening,and inconsistent conductor sag,etc..In addition the paper puts forward issues to be paid attention during construction.
出处 《电力建设》 2010年第4期40-43,共4页 Electric Power Construction
关键词 二牵n 张力放线 施工工艺 2-pulling n-wire line stringing under tension construction technology
  • 相关文献

参考文献10

二级参考文献9

  • 1Q/GDW154-2006《1000kV架空输电线路张力架线施工工艺导则》.
  • 2DL/T875-2004《输电线路施工机具设计、试验基本要求》.
  • 3DL/T685-1999《放线滑轮基本要求、检验规定及测试方法》.
  • 4SDJJS2-1987《超高压架空输电线路张力架线施工工艺导则》(试行).
  • 5DL5009.2-2004《电力建设安全工作规程第2部分:架空电力线路》.
  • 6DL/T5106-1999《跨越电力线路架线施工规程》.
  • 7Q/GDW153-2006《1000kV架空送电线路施工及验收规范》.
  • 8Q/GDW163-2007《1000kV架空电力线路工程施工质量及评定规程》.
  • 9IEEE Std524-2003 《IEEE Guide to the Installation of Overhead Transmission Line Conductor》.

共引文献41

同被引文献41

引证文献10

二级引证文献27

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部