摘要
基于灰色系统理论,应用其等时距GM(1,1)模型及改进的新陈代谢模型对沉降进行预测,通过与蕴藻浜特大桥一墩的沉降观测资料的对比分析,证明文中提出的工后沉降灰色理论预测方法,在工程实际中是可行的。
Based on Grey Theory, this paper predicts settlement with equal interval GM (1, 1 ) model and improved metabolism model. Through contrast analysis of settlement data of Yunzaobang Bridge Abutment, it is proved that the prediction method for post-construction settlement based on Grey theory is feasible in engineering practice.
出处
《路基工程》
2010年第2期142-144,共3页
Subgrade Engineering
关键词
高速铁路
群桩基础
灰色模型
沉降预测
high-speed railway
group pile foundation
Grey model
settlement prediction