摘要
在医院总体改扩建目标的远期规划框架下,对医院老建筑实施改造,要注重控制设计变更、制定可行的施工方案,加强各方的协调配合,在不停止正常医疗活动的条件下,完成改造施工任务。
The overall change in the old hospital, expansion of long-term planning goals under the framework of implementation of the transformation of old buildings on the hospital, we should pay attention to control design changes, to develop a viable implementation plan, to strengthen coordination and cooperation of all parties, without cessation of normal health care activities, under the conditions of to complete the transformation of the construction task.
出处
《中国医院建筑与装备》
2010年第4期57-58,共2页
Chinese Hospital Architecture & Equipment
关键词
医院工程
老建筑改造
项目管理
Hospital project Transformation of the old building Project management