南京江心洲大桥吊索张拉施工控制研究 被引量:4

Research on Suspension Cable Tension and Construction Management of Nanjing Jiangxinzhou Bridge
下载PDF
导出
摘要 自锚式悬索桥体系转换过程中的吊索张拉是最复杂的施工工序,也是区别于地锚式悬索桥的一个施工控制难点。结合实际工程对自锚式悬索桥吊索张拉进行了理论分析,并采用有限元分析软件ANSYS进行了吊索张拉的施工计算。分析张拉过程中各吊索的受力状态、鞍座位移、塔顶变形等,确定了合理的吊索张拉方案并应用于工程实践。 Suspension cable tension is the most complex process in system transformation and also is the most difficult process in construction management of self-anchored suspension bridge.According to a practical engineering project,suspension cable tension of self-anchored suspension bridge is analyzed from the theory.Construction control of hanger installation is calculated by FEM software ANSYS.Tension state,saddle displacement and main tower deforming in the construction process are analyzed.At last,a rational method of cable tension is presented for construction.
出处 《石家庄铁道学院学报(自然科学版)》 2010年第1期26-30,共5页 Journal of Shijiazhuang Railway Institute
关键词 自锚式悬索桥 吊索张拉 施工控制 self-anchored suspension bridge suspension cable tension construction management
  • 相关文献

参考文献4

  • 1项海帆.高等桥梁结构理论[M].北京:人民交通出版社,2000..
  • 2Gil H,Cho C.Yong Jong Grand suspension bridge[J].Korea.Struct.Engrg.Int.,1998,8(2):97-98.
  • 3Poskitt T J.Structural analysis of suspension bridges[J].ASCE,ST1,1966,92:49-73.
  • 4John A O,David P B.Self-anchored suspension bridges[J].Journal of Bridge Engineering,1999,4(3):151-156.

共引文献72

同被引文献18

引证文献4

二级引证文献14

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部