摘要 分析了资源约束项目计划稳健性研究的现状,对项目计划稳健性进行了分类;在分类的基础上,对内在稳健性的影响因素进行了系统分析。 The present situation of research in robust of resource constrained project schedules is analyzed systematically. And then, A classification is proposed for project schedule robust. On the basis of the classification,influential factors of intrinsic robust are analyzed systematically.
出处 《太原理工大学学报(社会科学版)》 2010年第1期20-23,共4页 Journal of Taiyuan University of Technology(Social Science Edition)
基金 中国博士后科学基金(20070420922) 国家自然科学基金(60574071) 广西壮族自治区教育厅科研项目(200712LX128) 广西民族大学引进人才科研启动项目(200702YZ01)
关键词 资源约束 项目计划 内在稳健性 resource-constrained project schedule internal robust
  • 相关文献

参考文献13

  • 1Willy Herroelen and Roel Leus. Robust and reactive project scheduling..a review and classification of procedures[J]. International Journal of Production Research,2004,42(8) : 1599-1620.
  • 2Stijn Van de Vonder, Erik Demeulemeester, Willy Herroelen and Roel Leus. The trade-off between stability and makespan in resource-constrained project scheduling[J]. International Journal of Production Research, 2006,44(2) : 215-236.
  • 3M. A. Al-Fawzan and Mohamed Haouari. A bi-objective model for robust resource-constrained project scheduling[J]. International Journal of Production Economics, 2005,96 (2): 175-187.
  • 4Goldratt E M, Critical Chain[M]. Great Barrington: North River Press, 1997.
  • 5Wiest J. D. Some properties of schedules for large projects with limited resources [J]. Operations Research, 1964,12 (3) :395-418.
  • 6刘士新,宋健海,唐加福.基于关键链的资源受限项目调度新方法[J].自动化学报,2006,32(1):60-66. 被引量:63
  • 7赵道致,廖华,刘一骝.关键链法:一种新型的项目进度计划方法[J].天津理工大学学报,2005,21(2):8-12. 被引量:32
  • 8王淑云,朱祥松,李洁.基于资源约束的扩张关键路径法研究[J].管理工程学报,2006,20(1):109-111. 被引量:11
  • 9王仁超,欧阳斌,王琳,褚春超.工程项目计划“关键性”问题拓展研究[J].系统工程与电子技术,2004,26(7):914-917. 被引量:6
  • 10Babak Abbasi, Shahram Shadrokh and Jamal Arkat. Bi-objective resource-constrained project scheduling with robustness and makespan criteria[J]. Applied Mathematics and Computation, 2006, 180 ( 1 ) : 146-152.

二级参考文献25

  • 1Blackstone J. Complexity of computer scheduling algorithms under resource constraints[ A]. First meeting of the AFCETSMF on applied mathematics[ C]. Poland: Palaiseau, 1978.169- 178.
  • 2Elmaghrabya S E E, Herroelenb W S, Leusb R. Note on the paper 'Resource- constrained project management using enhanced theory of constraint' by Wei et al [ J ]. International Journal of Project Management, 2003, 21 (4): 301 - 305.
  • 3Herroelen W, De Reyck B, Demeulemeester E. Resourceconstrained project scheduling: a survey of recent developments[J]. Computers and Operations Research, 1998, 25(4): 279-302.
  • 4Zhao Daozhi, Liao Hua. The study of resource constrained multi-project scheduling problem based on genetic algorithms[A]. Jiang Zhibin, Qian Xingsan, Jiang Zuhua. The 10th international conference on industrial engineering and engineering management [ C ]. Beijing: China Machine Press,2003. 12.
  • 5Bouleimen K, Lecocq H. A new efficient simulated annealing algorithm for the resource-constrained project scheduling problem and its multiple mode version[ J]. European Journal of Operational Research. 2003, 149(2): 268-281.
  • 6Goldratt E M. The goal great[M]. 2nd revised ed. Barrington: North River Press, 1992.
  • 7Goldratt E M. Critical chain[M]. Great Barrington: North River Press, 1997.
  • 8Chase R, Aquilano N. Production and operations management: manufacturing and services[ M]. Irwin: Homewood,IL, 1995.
  • 9Newbold R C. Project management in the fast lane-applying the theory of constraints [ M]. Boca Raton: The St. Lucie Press, 1998.
  • 10Zinovy D, Radovilsky. A quantitative approach to estimate the size of the time buffer in the theory of constraints[J]. International Journal of Production Economics, 1998, 55(2):113 - 119.

共引文献94

同被引文献48

引证文献4

二级引证文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部