摘要
通过南水北调工程中一百余条静探曲线的相关距离研究,对用相关函数法求静探曲线相关距离过程中所出现的各种问题,如计算方法的选择、异常数据的影响、样本容量的选取等进行了分析。
In this paper,some problems appeared in the coures of determining the relative distance of static cone genetration curves by Relative Function Method are analgzed,such as the selection of calculating method,the influence of abnormal data,the option of sample volume,on the basis of the study of about one hundred static cone penetration curves in Nanshuibeidiao Project.Some conclusions are made in the end.
出处
《岩土力学》
EI
CAS
CSCD
1998年第1期55-59,共5页
Rock and Soil Mechanics
关键词
静探曲线
相关距离
相关函数
间隔距离
调水工程
static cone penetration curve, relative distance,relative function,interval distance,abnormal data