摘要 目的系统研究斜拉索和水平索组成的混合体系斜拉桥的拉索张拉方法、施工工艺及施工关键技术.方法以沈阳市三好桥拉索施工为研究对象,针对由斜拉索和水平索组成的混合体系相互影响的特点,从理论上分析钢绞线拉力均值性和索力之间的关系.结果导出控制等值张拉法的张力计算公式.三好桥拉索施工关键技术为:首先进行水平索施工,一侧水平索先张拉到90%的初索力,待另一侧同索号的水平索安装初张拉后,两根水平索同时张拉至100%的初张拉力,水平索全部张拉完成后,再进行斜拉索的施工.结论对于钢拱塔斜拉桥拉索施工,需要处理好水平拉索的安装张拉带来的低应力锚固状态不利问题,把握住先水平索张拉,再进行斜拉索张拉的关键技术,混合体系索才能安装成功. The cable tensioning method, construction technology and construction's key technology of mixed system of cable-stayed bridge composed of cable-stayed and horizontal cable are studied. In this paper, Shenyang Sanhao Bridge cable construction is taken as the research object. On the account of the interaction characteristics of the mixed system cable of the cable-stayed and level and from the theoretical viewpoint, the relationship between the strand pulling force mean and the cable force are analyzed. Then the export control laws equivalent tension calculation formula can be got. The key construction technologies of the Sanhao Bridge cables are: Firstly, horizontal cable construction. Secondly, one side of the level of pre-tensioned cable pull 90% of the initial cable force until the other side of the issue of the level of the same cable is installed in early tension,the two levels of cable tension at the same time pull up to 100% of the initial tension. Finally, the level of all the tension cable is completed;the construction of cable-stayed can be furthered. For the steel tower cable-stayed bridge cable-arch construction, the negative anchoring problem of the low stress state caused by the level of cable tension need deal with. If the key technologies are grasped that the first level of cable is tensioned firstly, and then the cable-stayed and the mixed-system cable can be installed successfully.
出处 《沈阳建筑大学学报(自然科学版)》 CAS 北大核心 2010年第2期292-295,共4页 Journal of Shenyang Jianzhu University:Natural Science
基金 辽宁省教育厅科技攻关项目(2008586) 中交集团科技研发项目(kyht2008-05)
关键词 钢拱塔 斜拉桥 斜拉索 锚具 钢绞线 steel tower arch cable-stayed bridge stayed cable anchorage steel strand
  • 相关文献

参考文献10

  • 1王建华,许佳平,戴宗诚.通化西昌斜拉桥斜拉索施工技术[J].桥梁建设,2006,36(A01):77-80. 被引量:4
  • 2陈林.平行钢绞线斜拉索施工技术[J].公路交通技术,2008,24(5):66-69. 被引量:15
  • 3张哲,杜蓬娟,黄才良.公和斜拉桥设计与施工[J].桥梁建设,2002,32(1):67-70. 被引量:8
  • 4Pao-Hsii,Tzu-Yang,Tang.Analysis of cable-stayed bridges during construction by cantilever methods[J].Computers and Structures,2004,82(5):329-346.
  • 5包龙生,杨炳成,于玲.吊拉组合索桥的模型建立与初始索力确定[J].沈阳建筑大学学报(自然科学版),2004,20(4):265-268. 被引量:11
  • 6Takenouchi K.Single pylons for curved cable-stayed bridges[J].Structural Engineering International,1998,8(4):269-272.
  • 7Shinozuka M,Jan C M.Digital simulation of random process and its a plications[J].Journal of Sound and Vibration,1972,25(1):111-128.
  • 8Brien.Genera solution of suspended cable problems[J].Journal of the structural Divison,1967,66(5):231-234.
  • 9Deodatis G.Simulation of ergodic multivariate stochastic process[J].Journal of Engineering Mechanics,1996,122(8):568-572.
  • 10Shinozuka M,Deodatis G.Simulation of stochastic process by spectral representation[J].Applied Mechanics Review,1991,44:191-204.

二级参考文献13

  • 1Takenouchi K. Single pylons for curved cable- stayed bridges[J]. Structural Engineering International, 1998, 8 (4): 269 -272.
  • 2MengYun, ChenShimin. Design Study of Nanpanjing Combined Cable- stayed Suspension Bridge[J ], Bridge into 21 Century, 1995(10) :63 - 65.
  • 3Ahmet H Gursoy. Lateral wind on side spans of suspension bridges[J].Journal of Structural Engineering, ASCE,1968,94(10):2399 - 2410.
  • 4林元培.斜拉桥,1994.
  • 5刘士林;梁智超;候金龙.斜拉桥,2002.
  • 6严国敏;劳远昌.现代斜拉桥,1996.
  • 7交通部第一公路工程总公司.JTJ 041-1989.公路桥涵施工技术规范,1989.
  • 8交通部重庆公路科学研究所.JTJ 027-1996.公路斜拉桥设计规范,1996.
  • 9周念先;杨共树.预应力混凝土斜拉桥,2004.
  • 10刘吉士.公路桥涵施工技术规范实施手册,2004.

共引文献34

同被引文献77

引证文献9

二级引证文献16

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部