期刊文献+

马堵山水电站溢流坝消能方式再优化试验研究 被引量:1

Research on Re-optimization Energy Dissipation Means of Madushan Spillway
下载PDF
导出
摘要 通过马堵山水电站溢流表孔水工断面模型消能型式优化试验表明,采用矩型宽尾墩+挑流的联合消能方式可以有效地消杀下泄水流的巨大能量,大坝下游河床冲坑深度明显减小,整体试验表明该消能方式能够有效地减小下游河道两岸回流范围和强度,为设计提供了科学依据。 Through the overflow spillway of the Madushan Hydroelectric Power Station hydraulic cross-section model optimization of energy dissipation testing pattern obtained, the use of rectangular flaring pier and ski-jump of joint dissipation method can be efficiently discharged water disinfectants for the tremen- dous energy, the dam downstream river bed significantly reduced the depth of scour hole, the overall tests showed that the energy dissipation method can effectively reduce the downstream section of the two sides return to the scope and intensity, in order to provide the scientific basis for the design.
出处 《黑龙江水专学报》 2010年第1期28-30,共3页 Journal of Heilongjiang Hydraulic Engineering College
关键词 宽尾墩 挑流 消能方式 再优化试验 马堵山水电站 flaring gate piers trajectory energy dissipation approach reoptimization test Madushan Hydropower Station
  • 相关文献

参考文献3

  • 1南京水利科学研究院.水工模型试验[R].南京:南京水利科学研究院,1985.
  • 2中水珠江规划勘测设计有限公司.云南省红河马堵山水电站工程预可行性研究报告(审定本)[R].广州:中水珠江规划勘测设计有限公司,2006.
  • 3珠江水利科学研究院.云南红河马堵山水电站水工模型试验研究报告[R].广州:珠江水利科学研究院,2007.

同被引文献3

引证文献1

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部