摘要
分析了潘田铁矿边坡V#滑体的滑动机理,提出了减载与抗滑桩支档的综合治理方案,经过近4年的观察,治理效果良好。
The sliding mechanism of V # sliding body in the slope in Pantian Iron Mine was analyzed and a comprehensive harnessing scheme using load reduction and support by slide resisting piles was adopted.About four years observation has shown that it has good harnessing effect.
出处
《金属矿山》
CAS
北大核心
1998年第11期10-11,22,共3页
Metal Mine