冬瓜山铜矿千米竖井工作面突水淹井及其治理 被引量:2

Water Irruption Flooding on Working Face of 1000m Deep Shaft and Its Control in Dongguashan Copper Mine
下载PDF
导出
摘要 竖井千米深处工作面突水淹井,国内没有先例,国际罕见。本文密切结合工程实际,从深井工作面突水原因分析入手,沿袭以往浅井、中深井治水的经验,采用工程类比法确定抛石注浆及工作面预注浆的施工方案。施工中利用水力平衡原理,使治理工程一次成功,堵水率达98%,总体性能达国际领先水平。 The water irruption flooding on the working face of 1000m deep shaft was not found in China,also was rare in the world.In close combination with the engineering reality,from the beginning of analyzing the causes of water irruption on the working face of deep shaft,by experiences in controlling the flooding of shallow and deeper shafts in the past,the plan on an engineering analogy method determining the throwing grout and the face pregrouting was adopted.The principle of hydraulic equilibrium was used in the construction to make the water controlling works meet with once success.The water intercepting rate was up to 98%,and the total performance of this works was in a position of international leading level.
作者 方正
机构地区 长沙矿山研究院
出处 《矿业研究与开发》 EI CAS 1998年第6期4-6,共3页 Mining Research and Development
关键词 水淹矿井 堵水 预注浆 铜矿 竖井井筒 矿井突水 Shaft flooding, Water interception, Pregrouting
  • 相关文献

参考文献1

  • 1王大纯等编著.术文地质学基础.北京:地质出版社.

同被引文献24

引证文献2

二级引证文献12

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部