4Vaurio J. K. Optimization of test and maintenance intervals based on riskand cost [ J]. Reliability Engineering and System Safety, 1995,49:23 - 36.
5Munoz A. , Martorell S. , Serradell V. Genetic algorithms in surveillanceand maintenance of components [ J ]. Reliability Engineering and System Safety, 1997,57 : 107 - 120.
6Chaudhuri D. An algorithm for maintenance and replacement policyusing fuzzy set theory [ J ]. Reliability Engineering and System Safety, 1995,50:79 - 86.
7Kwak R. Y. , etc..Development of an optimal preventive maintenaneemodel based on the reliability assessement for air-conditioning faeilitiesin office builidings [ J]. Building and Environm ent, 2004,39 : 1141 - 1156.
8Marseguerra M. , Zio E. Optimizing maintenance and repair policies viaa combination of genetic algorithms and Monte Carlo simulation [ J]. Reliability Engineering and System Safety, 2000,68:69 - 83.
9Borgonovo E. , Marseguerra M. , Zio E. Amonto Carlo method logical approach to plant abailability modeling with maintenance, aging and obsolescence [J]. Reliability Engineering and System Safety, 2000,67:61 - 73
10Marseguerra M. , etc. Condition-based maintenance optimization bymeans of genetic algorithms and Monte Carlo simulation [ J ]. Reliability Engineering and System Safety, 2002,77 : 151 - 166.