文章针对隧道工程的渗漏水的问题,提出了影响隧道的质量和使用寿命的顽疾——"渗漏水与冰冻",辽宁省通化至灌水铁路兴隆沟隧道的施工中采用了防水线与排水系统相结合的施工技术对其进行综合防范,防水效果良好,可为今后类似工程提供借鉴。
The article goes on the water leakage problem of tunnel in accordance with present condition,brings forward water leakage and freezing,which are directly involved in the tunnel project quality and service life.During the construction of Xing-longgou tunnel on Tong-hua~Guan-shui Railway in Liaoning Province,water line and drainage system construction technology are adopted to avoid such problems and satisfactory waterproofing effects have been achieved.The article provides good references for practice in the future.
出处
《辽宁省交通高等专科学校学报》
2009年第6期22-25,共4页
Journal of Liaoning Provincial College of Communications
关键词
隧道
防排水
防水层
变形缝
Railway tunnel
waterproofing and drainage
Waterproof layer
Deformation crack