期刊文献+

延迟焦化装置加热炉烟气余热回收系统改造 被引量:1

REVAMP FOR THE FLUE GAS WASTE HEAT RECOVERY SYSTEMS OF DELAYED COKING UNIT FURNACE
下载PDF
导出
摘要 介绍了2500kt/a延迟焦化装置加热炉烟气余热回收系统进行节能改造的情况,分析了加热炉空气预热器排烟温度过高的原因,采取改造对流室炉管、变换介质及流向、新增列管式空气换热器等措施,达到了降低加热炉排烟温度、提高加热炉热效率的目的,使加热炉热效率提高了4.6%。 This article presents the reconstruction measures of flue gas waste heat recycle sys-tem in 2.5 Mt/a delayed coking unit furnace for energy saving.It analyzes the causes of extra high exhaust gas temperature of the furnace air pre-heater.Corresponding improvement measures,such as reconstruction of convection room furnace tube,changing the flow of media and increasing tube heat exchanger,have been taken to solve the problems.With these measures,furnace thermal efficiency can be raised by 4.6%.And the direct economic benefit can reach up to 5 million RMB.
作者 武明波
出处 《石油化工设备技术》 CAS 2010年第2期7-10,共4页 Petrochemical Equipment Technology
关键词 延迟焦化 加热炉 余热回收 改造 delayed coking unit furnace waste heat recovery revamp
  • 相关文献

同被引文献3

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部