期刊文献+

吹填坝的原位监测和有限元分析

In-situ Inspection and Finite Element Analysis of Dredger Fill Dam
下载PDF
导出
摘要 通过对吹填坝体和地基的孔隙水压力、垂直沉降和水平变形的原位监测分析,控制泥浆吹填速度及施工质量,保证了在淤泥质软土地基中吹填坝的施工安全。用非线性有限元分析坝体地基的应力应变规律与原位监测成果相吻合。原位监测分析结果表明此类软土中吹填法筑坝是可行的,坝体是安全的。 For the dredger fill dam, by means of analysis of in-situ inspection data of pore water pressures.vertical settlements and horizontal deformations, the dredger speed of mud and construction quality are controlled to ensure onstruction safety of the dredger fill dam on the ground base of soft soil of sludge. The stress--strain laws of the dam ground base calculated by non-linear finite element analysis, coinside with the insitu inspection results. The analytic results of the in-situ inspection data show that the dam construction by dredger fill method is practical, and the dam body is safe.
出处 《中国农村水利水电》 1998年第12期17-20,共4页 China Rural Water and Hydropower
关键词 吹填坝 原位监测 有限元分析 沉降 水平变形 dreager fill dam,in-situ inspection,finite element analysis,settlement horizontal deformation
  • 相关文献

参考文献2

共引文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部