核电蒸汽发生器下封头内壁堆焊预(后)热工艺方案探讨和实施 被引量:3

Heating Process Discussion and Execution for Preheat and Post-heat of Inside Cladding on Channel Head of Steam Generator
下载PDF
导出
摘要 从传热学理论出发,对形状较复杂的核电蒸汽发生器下封头不锈钢堆焊预热和后热工艺方法进行了讨论,提出了详细的实施方案,并对具体的加热工艺从加热方法、工装、加热过程和温度控制等方面进行了描述。实践证明,采用的加热工艺方法是可行的。 Heating process for preheat and post-heat of inside stainless steel cladding on channel head of steam is discussed in detail.Execution of heating process is presented also.A detailed process from the heating method,tooling,heating process to temperature control,etc.are described.Practical application of this process demonstrated it′s feasible and valid.
出处 《压力容器》 北大核心 2010年第3期30-33,25,共5页 Pressure Vessel Technology
关键词 蒸汽发生器 下封头 预(后)热工艺 steam generator channel head preheating process
  • 相关文献

参考文献1

  • 1RCC-M,Design and Construction Rules for Mechanical Components of PWR Nuclear Islands[S].2000.

同被引文献20

  • 1朱跃钊,蒋金柱,桑芝富.影响胀接结构可靠性的几个因素[J].压力容器,2005,22(1):12-15. 被引量:18
  • 2杨自新,陈景毅.核反应堆压力容器用钢板(ASTM A533 BCI.1钢)的韧性[J].锅炉制造,1995(2):28-32. 被引量:5
  • 3张文钺.焊接冶金学(基本原理)[M].北京:机械工业出版社,1999..
  • 4中国机械工程学会焊接学会.焊接手册[M].北京:机械工业出版社,2001..
  • 5ASME锅炉及压力容器规范[S].美国机械工程师学会,2004.
  • 6ASME Boiler and Pressure Vessel Code,SectionⅡ,Materials,2001 Edition[S].
  • 7ASME Boiler and Pressure Vessel Code,SectionⅢ,Class 1 Components,2001 Edition[S].
  • 8Rossinins,Dassiistim,Benyounis K Y,et al.Methods of Measuring Residual Stresses in Components[J].Materials and Design,2012,35:572-588.
  • 9张敬才.压水堆反应堆压力容器设计引论[M].北京:中国核动力设计研究院,2011.
  • 10RCC-M,压水堆核岛机械设备设计和建造规则[S].2000.

引证文献3

二级引证文献11

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部