期刊文献+

上海轨道交通人民广场枢纽站大客流组织对策研究 被引量:22

Countermeasures on High Passenger Flow at Shanghai People Square Subway Hub
下载PDF
导出
摘要 上海轨道交通人民广场枢纽站是上海最大的公交枢纽与人员集散地之一。由于历史原因,该枢纽中的3条轨道交通线的站台不是一次规划建成的,因此在换乘通道、站台通行能力、收费区布局等方面均暴露出运营规模与客流总量不相适宜之处,给乘客的通行带来了安全隐患。因此,针对目前现状,以人民广场站为例,开展了大客流组织对策研究,通过行人仿真方案模型模拟,确定了8号线站台改善方案;提出了缓解换乘客流在1号线北侧站厅和2号线站厅通往大三角区域通道上对冲的措施,为今后轨道交通枢纽大客流站的运营管理提供参考。 With the improvement of rail transit network construction in Shanghai,urban rail transit (URT) has become the favourable travel choice of citizens because of its convenient and efficient service,and the ridership of URT system has increased significantly.As the largest public transport terminal of Shanghai,the People's Square Station assumes mismatching characters between operation scale and passenger volume in terms of the capacity of transfer corridor,platform and the layout of toll area,etc.,which will lead to potential safety hazard for passengers.Taking the People's Square Station for example,countermeasures of mass passenger organization are researched to provide useful experiences and lessons for future operation management of URT terminal stations.
作者 朱效洁
出处 《城市轨道交通研究》 北大核心 2010年第1期1-6,共6页 Urban Mass Transit
关键词 城市轨道交通 人民广场站 大客流 运营管理 urban rail transit People's Square Station high passenger flow operation management
  • 相关文献

参考文献3

二级参考文献6

共引文献53

同被引文献64

引证文献22

二级引证文献144

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部