摘要
结合临沂市鲁商凤凰城A5楼项目工程地质情况,介绍了该工程基坑降水设计方案及相关参数的计算方式,具体阐述了基坑降水及排水系统施工,并提出了应急预案和安全措施,为类似工程积累了宝贵经验。
Combining with the geological condition of A5 building project of Lushang Phoenix town in Linyi city, it introduces the pit water level lowering design of the project and the calculation of relevant parameters, outlines in details the construction of pit water level lowering and discharging system, and proposes emergency scheme and safety measures, therefore saves precious experience for similar construction works.
出处
《山西建筑》
2010年第13期88-89,共2页
Shanxi Architecture
关键词
基坑
降水方案
涌水量
排水系统
应急预案
foundation pit, water level lowering scheme, water yield, water discharging system, emergency scheme