针对地下连续墙在施工过程中的一些技术要点和难点,从槽壁水泥搅拌桩加固、连续墙成槽施工、成槽泥浆配制及管理做了详细阐述,并且结合实践提出了一点意见和解决办法,以指导实践。
Aiming at the technological points and difficulties in the construction process of the underground continuous walls, the paper illus- trates the aspects, from the intensification of concrete mixer pile on groove walls, groove construction of continuous wall, the preparation for groove mud, to management, and points out some suggestions and solutions by combining with practice, so as to direct the practice.
出处
《山西建筑》
2010年第13期109-110,共2页
Shanxi Architecture
关键词
地铁车站
地下连续墙
施工
subway station, underground continuous wall, construction