摘要
主要阐述了西安市地铁二号线TJSG-10标段盾构机穿越陇海铁路的技术保护措施,包括盾构施工参数的优化、监控量测信息的反馈等,并提出了既有线的加固方法,为类似工程积累了经验。
It mainly outlines the protection technology of shield machine crossing Longhai railway at TJSG-10 lot of Xi' an subway second line. The protection measures contain the optimization of shield construction parameters and the feedback of monitoring measurement information. It proposes the reinforcement measures of existing lines, hence accumulates experience for similar construction.
出处
《山西建筑》
2010年第13期304-306,共3页
Shanxi Architecture
关键词
湿陷性黄土
土压平衡式盾构
参数优化
监控量测
collapsible loess, earth pressure balance shield, parameter optimization, monitoring measurement