摘要
以广州地铁盾构隧道某施工段为背景,应用数值模拟相结合的方法,研究了富水砂层中盾构掘进施工引起周围地层位移场的分布规律,结果表明:计算结果与实测值吻合较好。
Taking a construction section of Guangzhou subway shield tunnel construction as example, with the combination of numerical simulation method, it studies the distribution rules of neighboring ground movement caused by shield heading construction at watery sand layer. The result shows that the calculated result is greatly consistent with practically measured data.
出处
《山西建筑》
2010年第13期323-324,共2页
Shanxi Architecture
关键词
隧道工程
沉降
数值分析
tunnel engineering, settlement, data analysis