摘要
结合具体工程实例,对预应力混凝土箱梁桥的预应力损失原因进行了分析,探讨了预应力损失的组成,阐述了预应力张拉施工时扁锚体系出现伸长值不足的原因,并提出了相应的控制措施,以期指导实践。
By combining with factual projects, the paper analyzes the prestressed damage reasons on the prestressed concrete box girder bridges, explores the components of the prestressed damage, and illustrates the reasons for shortage of the flat anchorage system in the pre- stressed tension construction, and points out some relative controlling measures, so as to direct the practice.
出处
《山西建筑》
2010年第13期326-328,共3页
Shanxi Architecture
关键词
预应力混凝土箱梁桥
预应力损失
伸长值
控制措施
prestressed concrete box girder bridge, prestressed damage, elongation value, controlling measures