摘要
地铁车站的建设有多种施工方法,因受周围环境的限制,采用暗挖法施工大跨车站时,NTR工法在结构防水、地面沉降及施工安全方面有一定的优势;沈阳地铁二号线新乐遗址站引进使用NTR工法,在国内尚属首次。
Various construction methods were used for subway station. With the advantage of structural waterproofing, ground subsidence and construction safety, NTR method was applied when surrounding environment was restricted and high-span station of tunneling method was constructed. In this paper, NTR method was introduced with the engineering background of Shenyang metro 2nd line Xinle station, which was used firstly in our china.
出处
《交通标准化》
2010年第8期105-109,共5页
Communications Standardization