摘要
在复杂的地质情况下,对实际工程中的深坑采用了沉井的基础形式,同时介绍了沉井的具体设计过程,并对施工中容易出现倾斜的情况提出了相应的措施,以完善沉井施工工艺。
Taken complicated geological conditions in considerations the foundation type-sunk well is adopted for the deep pit in practical works.In this paper practical design process of sunk well is introduced,at the same time in view of the inclination questions encountered in construction corresponding countermeasures are proposed,in order to perfect construction technology of sunk well.
出处
《山西建筑》
2010年第12期75-76,共2页
Shanxi Architecture
关键词
沉井
井壁
刃脚
倾斜
sunk well
side wall
foot blade
inclination