摘要
结合山西大医院综合住院楼工程地质情况和工期安排,详细介绍了该工程深基坑土方开挖的施工工艺,并阐述了施工过程中的安全保证措施,通过实践取得了良好的效益,为今后类似工程积累了经验。
Combined with the engineering geological situation and time limit arrangement of Shanxi Large Hospital comprehensive in-patient building,the construction process of the engineering deep foundation earth excavation was detail introduced.The safety guaranteeing measures in construction process were illustrated,the better coefficient was obtained by practice,which accumulated experience for future similar engineering.
出处
《山西建筑》
2010年第12期115-116,共2页
Shanxi Architecture
关键词
深基坑
土方工程
CFG桩
安全保证措施
deep foundation
earth engineering
CFG pile
safety guaranteeing measures