摘要
结合江都—海安高速公路下穿新长铁路工程实践,介绍了下穿铁路施工工程规模、施工组织,重点阐述了下穿铁路箱体顶推施工工艺过程及工艺控制措施,对顶进施工滑板后靠填土力进行验算,以积累经验供类似工程参考。
Combining the practice of construction craft of Jiang-Hai highway underthrough Xin-Chang railway,it introduces the dimensions and organization of project construction under railway.It elaborates the construction progress and craft control measure under railway and also calculates the earth volume after construction sliding board.So as to accumulate experience for similar project.
出处
《山西建筑》
2010年第12期259-260,共2页
Shanxi Architecture
关键词
高速公路
下穿铁路
顶推
施工工艺
highway
underthrough railway
top pile
construction craft