叙述了大型复杂站场的施工过渡方案及不断优化方案、优化完善设计的过程,太原站过渡施工共分三大部分,即站台区、站房区和咽喉区,重点介绍了站台区和咽喉区施工过渡方案及优化,以期指导施工实践,确保施工安全正点。
It introduces the transitional program and continuously optimizing program of large complicated railway yard construction and the process of design optimizing.The transitional construction of Taiyuan station consists of three parts of platform,station building and station throat.It puts stress on the introduction of the transitional program and optimizing process of the construction of platform and station throat in the hope of guiding construction practice and ensuring safe construction.