摘要
以浙江省余姚市的姚东大桥为背景案例,主要介绍了斜拉桥主塔的施工关键技术,从施工测量部分到混凝土的施工技术方面均作了较为详细的探讨和阐述,以积累斜拉桥施工经验。
Taking Yaodong Bridge in Yuyao of Zhejiang as the background case,the paper introduces the construction key technology of the cable-stayed bridge,and explores and illustrates from the construction measurement and the construction technology,so as to accumulate the construction experience for the cable-stayed bridge.