摘要
根据轨道交通建设的关键线路:车站和区间贯通、轨道铺设、供电系统合闸送电、通车试运营,重点分析"洞通"中设计、前期准备、车站工期、盾构进度、盾构始发车站、盾构过站车站6个要素;"轨通"中铺轨条件、铺轨基地、沉降影响、铺轨工期、轨行区等5个要素;"电通"中主变所工期、主变所设备安装时机、运输时间、施工干扰、安装时间5个要素;"车通"中前期准备、车辆运输、车辆基地、热滑、联调、试运行等6个要素,理清控制节点若干关键工序的逻辑关系,为科学、合理、快速进行轨道交通建设提供新思路和参考。
According to critical paths in urban rail transit construction : the station and the sector penetration, track laying, the power supply system to switch on the power transmission, to be open to traffic try the operation, the selective analysis "the hole passes" designs, the earlier period preparation, the station time, the shield progress, the initial sending station, the over - carriage station 6 essential factors ; "the axle passes" lays rails the condition, to lay rails the base, the subsidence influence, the laying rails time, the axle zone and so on 5 essential factors; "the electricity passes" the host to pool labor the time, the installment opportunity, the transportation time, the construction disturbance, the setup time 5 essential factors; "the vehicle passes" the earlier period preparation, the vehicular traffic, the vehicles base, to slide, jointing shake down testing, to try hotly to move and so on 6 essential factors, clears off control node certain critical processes the logical relation, reasonable carries on the track transport facilities for the science to provide new references.
出处
《铁路工程造价管理》
2010年第2期8-13,共6页
Railway Engineering Cost Management
关键词
轨道交通
工程筹划
“四通”
控制节点
关键工序
urban rail transit
project planning
Four - transfixion
controlling node
key process