期刊文献+

考虑处置和服务水平影响的混合系统库存决策 被引量:3

Inventory decision-making for a hybrid system considering the effect of the disposal and the service level
下载PDF
导出
摘要 为确定最优的制造与再制造策略,对混合系统进行了研究。在该系统中,因再制造能力不足,返回的旧产品仅有一部分用于再制造,其余的被处置。用于再制造的旧产品构成了可翻新品库存。顾客需求恒定且由服务性产品库存来满足,该库存由制造新品与再制造品组成。顾客允许延迟交货,但企业的最大缺货量受其服务水平制约。在两类策略下分别构建了库存决策模型,即一次制造准备和至少一次再制造准备策略与至少一次制造准备和一次再制造准备策略,并利用消元思想和差分函数对模型求解,得到了最优的制造与再制造批量等求解公式。结果表明,能找到最优的制造与再制造策略,并存在一个最优的服务水平控制点。 To determine the optimal manufacturing and remanufacturing policy,a hybrid system is investigated.In this system,due to the limitation of remanufacturing capacity,the used products are returned from customers but only partially remanufactured while the rest are disposed off.Those return products remanufactured constitute the recoverable inventory.Constant demand of Customers is fulfilled by the serviceable inventory which consists of manufactured products and remanufactured products.Backorder is permitted by customers,but the maximum shortage is limited by the service level of the enterprise.The inventory decision-making models are formulated under two policies:(1)one manufacturing setup and at least one remanufacturing setup policy,and(2)at least one manufacturing setup and one remanufacturing setup policy respectively,the corresponding solution procedures are given by the elimination theory and the difference function,and the formulae on the optimal manufacturing and remanufacturing lot-sizes and so on are derived.The results indicate that the optimal manufacturing and remanufacturing policy can be obtained and there exists an optimal control point for the service level.
作者 袁开福 高阳
出处 《计算机集成制造系统》 EI CSCD 北大核心 2010年第3期573-579,共7页 Computer Integrated Manufacturing Systems
基金 国家自然科学基金资助项目(70572060) 贵州财经学院在读博士学术研究基金资助项目(2006BS019)~~
关键词 库存控制 混合系统 再制造 制造 处置 服务水平 inventory control hybrid system remanufacturing manufacturing disposal service level
  • 相关文献

参考文献20

  • 1ERWIN V D,MARC L S,ROMMERT D,et al.Inventory control in hybrid systems with remanufacturing[J].Management Science,1999,145(5):733-747.
  • 2STEINHILPER R.Remanufacturing-the ultimate form of re-cycling[M],Stuttgart,Germany:Fraunhofer IRB Verlag,D-70569 Stuttgart,1998.
  • 3KERR W.RYAN C.Eco-efficiency gains from remanufactur-ing:a case study of photocopier remanufacturing at Fuji Xerox Australia[J].Journal of Cleaner Production,2001,9 (1):75-81.
  • 4MARGARETE A S.A critical assessment of motives for product recovery:the case of engine remanufacturing[J].Journal of Cleaner Production,2007,15(11/12):1147-1157.
  • 5FERRER G.The economics of tire remanufacturing[J].Resources,Conservation and Recycling,1997,19(4):221-255.
  • 6GUIDE Jr V D R.VAN WASSENHOVE L N.Managing product returns for remanufacturing[EB/OL].[2009-03-09].http://findarticles.com/p/articles/mi _ qa3796/is_ 200107/ai_ n8956009/? tag:content:coll.
  • 7TOKTAY LB.WEIN L M.ZENIOSS A.Inventory management of remanufacturable products[J].Management Science,2000,46(11):1412-1426.
  • 8SCHRADY D A.A deterministic inventory model for repairable items[J].Naval Research Logistics Quarterly,1967,14 (3):391-398.
  • 9NAHMIAS N.RIVERA H.A deterministic model for a repairable item inventory system with a finite repair rate[J].International Journal of Production Research,1979,17 (3):215-221.
  • 10TEUNTER.R H.Economic ordering quantities for recoverable item inventory systems[J].Naval Research Logistics,2001,48(6):484-495.

二级参考文献9

  • 1Beltran L S. Reverse Logistics:Current Trends and Practices in the commercial World [ J ]. Logistics Spectrum,2002,36(3) :4 - 8.
  • 2Martijn Thierry, Marc Salomon, Jo van Nunen, and Luk Van Wassenhove, Strategic Issues in Product Recovery Management[J ]. California Management Review, 1995,37(2):114 - 135.
  • 3Mortiz Fleisehmanna, Hans Ronald Krikke, Rommert Dekker, simme Douwe P. Flapper. A characterisstion of logistics networks for product recovery [ J ]. Omega, 2000,28(6) :653 - 666.
  • 4Mortiz Fleischmanna, Jacqueline M. Bloemhof - Ruwaard,Rommert Dekker, Erwin van der Laan, Jo A.E.E.van Wassenhove. Quantitative model for reverse logisties:A review[J ]. European Journal of Operational Research, 1997,103:1 - 17.
  • 5Knut Richter. The EOQ repair and waste disposal model with variable setup numbers[J]. European Journal of Operational Research, 1995,96: 313 - 324.
  • 6Knut Richter. The extended EOQ repair and waste disposal model[J]. International Journal of Production Economics,1996,45(1 - 3) :443 - 448.
  • 7Teunter, R.H., Economic ordering quantities for revoverable item inventory systems[J]. Naval Research Logistics,2001,48:484 - 495.
  • 8Teunter,R.H., Vlachos, D.On the necessity of a disposal option for returned products that can be remanufactured[J]. International Journal of Production Economies, 2002,75:257 - 266.
  • 9达庆利,黄祖庆,张钦.逆向物流系统结构研究的现状及展望[J].中国管理科学,2004,12(1):131-138. 被引量:379

共引文献32

同被引文献49

  • 1赵宜,蒲云,尹传忠.回收物流库存控制研究[J].中国管理科学,2005,13(5):49-53. 被引量:33
  • 2Choi D W, Hwang H, Koh S G. A generalized ordering and recovery policy for reusable items[J]. European Journal of Operational Research, 2007, 182 : 764-774.
  • 3Richter K. The EOQ repair and waste disposal model with variable setup numbers[ J]. European Journal of Operational Research, 1996, 95(2): 313-324.
  • 4Richter K. The extended EOQ repair and waste disposal model[ J]. International Journal of Production Economics, 1996, 45 ( 1-3 ) : 443- 447.
  • 5Richter K. Pure and mixed strategies for the EOQ repair and waste disposal problem[ J]. OR Spektrum, 1997, 19: 123-129.
  • 6Richter K, Dobos I. Analysis of the EOQ repair and waste disposal model with integer setup numbers[ J]. International Journal of Production Economics, 1999, 59: 463-467.
  • 7Dobos I, Richte K. An extended production/recycling model with stationary demand and return rates[ J]. International Journal of Production Economics, 2004, 90 : 311-323.
  • 8Dobos I, Richte K. A production/recycling model with quality consideration[ J]. International Journal of Production Economics, 2006, 104: 571-579.
  • 9Mabini M C, Pintelon L M, Gelders L F. EOQ type formulation for controlling repairable inventories[ J]. International Journal of Production Economics, 1992, 54 : 173-192.
  • 10Tang O, Teunter R. Economic lot scheduling problem with returns[ J]. Production and Operations Management, 2006, 15 (4) : 488-497.

引证文献3

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部