摘要
天古崖水库目前水位1000.00m左右,将来设计最高蓄水位1027.29m,水库的入渗问题直接影响到隧道方案的确定。文中根据野外现场调查、综合勘探及区域水文地质资料,通过水文地质分析及计算,认为水库地表水渗漏,会造成库区一定范围内地下水位的局部雍升,但与隧道不会发生水力联系。
The current water level of Tianguya Reservoir is about 1000. 00 m and the design highest water level is 1027.29m in future. The infiltration of reservoir directly affects the determination of tunnel location. Based on fieldinvestigation, comprehensiveexplorationandregionalhydro-geologicalinformation, throughhydro-geologieal analysis and calculation, this paper considers that surface water leakage of the reservoir will result in partial lifting of underground water level within a certain range, but it will not have hydraulic connection with the tunnel.
出处
《路基工程》
2010年第B04期24-26,共3页
Subgrade Engineering
关键词
天古崖水库
隧道
水位
水文地质关系
Tianguya Reservoir
tunnel
water level
hydro-geological relation