期刊文献+

宝成铁路新109隧道改线工程地质选线研究

Study on Line Selection of No. 109 Newly-built Tunnel Relocation Engineering of Baoji-Chengdu Railway
下载PDF
导出
摘要 宝成铁路新109隧道改线段受“5.12”汶川特大地震影响,次生地质灾害发育。文中对改线区域内地质条件进行了综合分析,提出了地质选线原则,对不同方案的地质条件进行了综合分析,最终确定采用DK方案。文中并对高烈度山区铁路的勘察设计提出了建议。 Secondary geological disasters occurred in relocation section of Baoji-Chengdu Railway No. 109 Tunnel affected by " 5.12" Wenehuan Earthquake. This paper carried out comprehensive analysis on geological condition within the relocation region and puts forward the principle of line section. Through comprehensive analysis on geological conditions of different programs, DK program is finally determined. In addition, this paper puts forward suggestions on survey design of high intensity railway in mountainous areas.
作者 李兴龙
出处 《路基工程》 2010年第B04期35-37,共3页 Subgrade Engineering
关键词 宝成铁路 新109隧道 不良地质 地质选线 Baoji-Chengdu Railway No. 109 newly-buih Tunnel unfavorable geology geologicalline selection
  • 相关文献

参考文献3

  • 1刘玲.宝成铁路109号隧道改线应急工程方案研究[J].科技交流,2008,38(3):27-30. 被引量:1
  • 2何发亮,王石春,李苍松.中国西部地震区道路工程建设若干问题探讨[C].地震灾害对铁路的影响及其防治学术研讨会论文集,2008:13-18.
  • 3汶文钊浅谈地震对宝成铁路的影响及灾后防护措施[C].地震灾害对铁路的影响及其防治学术研讨会论文集,2008:60-69.

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部