深长高压旋喷桩加固处理软土地基施工技术 被引量:5

Construction Technology of Soft Soil Foundation Reinforcement with Deep Long High Pressure Jet Grouting Piles
下载PDF
导出
摘要 甬台温铁路DK4+090-+644段路基为浸水及软土地基路堤,长554m,设计采用深长高压旋喷桩进行加固处理,最大加固深度达42m,加固效果良好,满足客运专线路基的沉降要求。文中结合该段路基的施工情况,介绍深长高压旋喷桩的啧浆配合比设计、施工工艺、质量检测及控制等。 554m long DK4 + 090 - DK4 + 644 Section of Yongtaiwen Railway is of immersion foundation and soft soil embankment. It is designed to be reinforced with deep long high-pressure jet grouting piles with the maximum reinforcement length reaching 42m, which receives good effect and satisfies subgrade settlement requirement of passenger dedicated line. Combined with the subgrade construction condition of this section, this paper introduces the grouting proportion design, construction technology, quality inspection and control of deep long high pressure jet grouting pile.
作者 李建康
出处 《路基工程》 2010年第B04期144-146,共3页 Subgrade Engineering
关键词 深长 高压旋喷桩 软基 施工 检测 deep and long high pressure jet grouting pile soft foundation construction inspection
  • 相关文献

参考文献1

  • 1中国建筑科学研究院.JGJ79-2002、J220-2002,建筑地基处理技术规范[S].北京:中国建筑工业出版社,2002.

同被引文献31

引证文献5

二级引证文献8

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部