摘要
大化水电站扩建工程的厂房布置设计,充分考虑工程特点,各专业紧密配合,采用圆筒式厂房和安装场厂顶布置的方案,大大降低了工程量,为工程经济的合理性打造了坚实的基础。
Based on characteristics of the extension project of Dahua Hydropower Station, its power house is designed to be cylindrical with the erection yard on the top. Such design makes the project economically reasonable by greatly reducing the engineering workload.
出处
《红水河》
2010年第2期1-3,7,共4页
Hongshui River
关键词
厂房
圆筒式结构
安装场布置
大化水电站扩建工程
power house
cylindrical structure
arrangement of erection yard
extension project of Dahua Hydropower Station