期刊文献+

深厚覆盖层条件下高拱坝坝身泄洪消能的布置方式研究 被引量:7

Study on the layout of flood discharge and energy dissipation of high arch dam within deep overburden layers
原文传递
导出
摘要 本文以某大型高拱坝工程为例,研究了深厚覆盖层条件下高拱坝坝身泄洪消能的布置方式,提出了以"护坡不护底、不设二道坝、部分预挖覆盖层"取代传统的"水垫塘+二道坝"泄洪消能布置方案的设想,并进行了水工模型试验研究,初步论证了上述方案的可行性。本文的研究成果可供国内类似工程参考。 This paper investigates the layout scheme of flood release works and energy dissipation of high arch dams within deep overburden layers through scale-model tests conducted for a practical large-size high dam as a study case. By the new scheme proposed in this paper,only the slopes need be protected by lining technique,while the protection of scour pool bottom and the secondary dam that are adopted traditionally,are eliminated. The feasibility of this new idea is verified by the results of our model tests,which provides a reference to the design of similar dams in China.
出处 《水力发电学报》 EI CSCD 北大核心 2010年第2期26-30,共5页 Journal of Hydroelectric Engineering
基金 国家自然科学基金项目(No.50539060)
关键词 高拱坝 泄洪消能 护坡不护底 水垫塘 二道坝 high arch dam flood discharge and energy dissipation lining slope and no bottom protection plunge pool secondary dam
  • 相关文献

参考文献2

  • 1潘家铮 何王景.中国大坝50年[M].北京:中国水利水电出版社,2000..
  • 2廖仁强 向光红 李伟.乌东德水电站泄洪消能设计.泄水工程与高速水流,2008,:234-237.

共引文献60

同被引文献54

引证文献7

二级引证文献10

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部