地铁车站钢支撑结构中的临时立柱施工实践 被引量:3

Construction Practice of Temporary Columns in Metro Station Steel Supporting Structure
下载PDF
导出
摘要 对于地下空间超宽的地下车站,为了确保钢支撑结构的安全,需要设置支撑钢作为临时立柱。以北京望京西站为例,介绍了临时立柱设计及施工工艺流程,并针对格构柱尺寸狭小难以设立临时立柱的问题,采用了普通焊接钢管灌注混凝土工艺的解决方法。 To guarantee the safety of steel supporting structures in metro station extra-wide underground space, temporary steel columns as supporting structure are needed. To take the Wangjing west metro station of Beijing subway as an example, introduced design and construction technological flow of temporary columns. In allusion to small size of lattice column thus hard to construct temporary columns, the common welded steel tube concrete grouting technology is used.
作者 李贤军
出处 《中国煤炭地质》 2010年第3期37-39,49,共4页 Coal Geology of China
关键词 地铁基坑 钢支撑支护 临时立柱 望京西站 subway foundation pit steel supporting structure temporary column Wangjing west metro station
  • 相关文献

参考文献6

二级参考文献13

  • 1刘国宝.盖挖顺作法在深圳地铁科学馆站的应用[J].铁道标准设计,2004,24(10):74-75. 被引量:11
  • 2《地铁设计规范》问与答(六)[J].都市快轨交通,2005,18(2):83-83. 被引量:8
  • 3王梦恕.地下工程浅埋暗挖技术通论[M].合肥:安徽教育出版社,2003.
  • 4GB50007-2002.建筑地基基础设计规范[S].[S].,..
  • 5GB50017—2003.钢结构设计规范[S].[S].,..
  • 6GB50299-1999.地下铁道工程施工及验收规范[S].[S].,..
  • 7GB50319-2000.建设工程监理规范[S].[S].,..
  • 8GB50205-2001.钢结构工程施工质量验收规范[S].[S].,..
  • 9JTJ 94-94,建筑桩基技术规范[S].
  • 10孔恒 王梦恕 谭忠盛等.城市地铁隧道工作面开挖的地层变位规律.现代隧道技术,2004,41:52-56.

共引文献19

同被引文献13

引证文献3

二级引证文献11

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部