期刊文献+

井筒中钻柱系统非线性螺旋屈曲稳定性分析 被引量:4

NONLINEAR STABILITY ANALYSIS FOR HELICAL BUCKLING OF DRILL STRING IN WELLBORE
下载PDF
导出
摘要 针对钻井过程中钻柱工作载荷或钻压超过某一临界值导致钻柱失稳现象,建立了钻柱非线性稳定性问题的分析模型,用数值分析的方法对整个钻柱系统的非线性屈曲过程进行了有限元仿真分析,解释了钻柱的失稳机理以及钻柱自重、钻压、转速、扭矩和井斜角等因素对钻柱屈曲的影响规律,研究了钻柱在井筒中发生屈曲时的位移、受力状况和各种工况下的失稳临界载荷。结果表明,在相同条件下钻柱螺旋屈曲临界载荷随井斜角增大而增大,呈非线性变化;临界载荷随扭矩的增大而减小,井斜角较大时临界载荷减小的幅度较小。对钻柱在井筒中的非线性屈曲行为研究和钻具组合设计的优化具有一定的参考价值。 Aiming at the instability phenomena of drill string in the process of drilling operation,the nonlinear drill string helical bucking model is set up.Also,the finite element analysis is presented with numerical method.The theory and the rule of drill string bucking influenced by dead load,rotating speed,weight on the bit and the well deviation are explained.It is shown that under the same conditions,the helical buckling load increases nonlinearly with the increase of the well deviation and decreases nonlinearly with the increase of torsion and the reduction decreases with the increase of deviation angle.From the analysis,the displacement and stress are objectively reflected when drill string buckling occurs in the well.The critical buckling load of drill string under various conditions is forecasted.For the study on nonlinear buckling of drill string,the optimization of BHA design and the reduction of drilling cost,there are both the theoretical and project practical significance.
出处 《西南石油大学学报(自然科学版)》 CAS CSCD 北大核心 2010年第2期159-163,共5页 Journal of Southwest Petroleum University(Science & Technology Edition)
基金 国家自然科学基金(90410004) 新世纪优秀人才支持计划项目(NCET-05-0766)
关键词 钻柱 稳定性 螺旋屈曲 临界载荷 有限元 drill string stability helical buckling critical load finite element
  • 相关文献

参考文献19

  • 1Trindade M A,Wolter C,Sampaio R.Karhunen Loève decomposition of coupled axial/bending vibrations of beams subjected to impact[J].Journal of Sound and Vibration,2005,279(3-5):1015-1036.
  • 2Trindade M A,Sampaio R.Dynamics of beams undergoing large rotations accounting for arbitrary axial deformation[J].Journal of Guidance Control and Dynamics,2002,25(4):634-643.
  • 3Stefan M,Qiu Wei yong,Volk L,et al.An improved analysis of axial force along coiled tubing in inclined horizontal wellbores[C].SPE 37056,1996.
  • 4Paslay P R,Bogy D B.The stability of a circular rod laterally constrained to be in contact with an inclined circular cylinder[J].Journal of Applied Mechanics,1964,31(3):606-610.
  • 5Wu Jiang,Hans C.Buckling and lockup of tubulars in inclined wellbores[J].Drilling Technology,1994,56(1):7-15.
  • 6Hishida H,Ueno M,Higuchi K,et al.Prediction of helical/sinusoidal buckling[C].SPE 36384,1996.
  • 7于永南,韩志勇.斜直井眼中钻柱屈曲的研究[J].力学与实践,1997,19(5):17-19. 被引量:3
  • 8于永南,韩志勇,路永明.弯曲井眼中柔性钻柱的屈曲问题[J].石油大学学报(自然科学版),1997,21(6):32-34. 被引量:14
  • 9于永南,胡玉林,韩志勇,路永明.井眼中钻柱稳定性分析的有限元法[J].石油大学学报(自然科学版),1998,22(6):74-78. 被引量:12
  • 10董永辉,况雨春,伍开松,冯胜.弯曲井眼中钻柱屈曲的非线性有限元分析[J].石油机械,2008,36(4):25-27. 被引量:4

二级参考文献42

共引文献79

同被引文献39

引证文献4

二级引证文献14

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部