摘要
文章以重庆嘉悦大桥主桥工程为依托,通过索梁锚固区缩尺模型试验和有限元分析比较,评价了主梁斜拉索锚固区的工作性能,并为梁斜拉索锚固区的构造和配筋设计提出合理的改进措施和建议。
Using Jiarui Bridge's main bridge construction project as an example, the article uses limited variable testing and cable-girder zone testing to evaluate the working condition of the cable-girder zone.It also gives recommendations to how to improve the design and structure.
出处
《西部交通科技》
2010年第2期77-81,共5页
Western China Communications Science & Technology
关键词
矮塔斜拉桥
索梁锚固区
缩尺模型试验
仿真分析
Low-tower cable-stayed towers
Cable-girder zone
Small-scale model testing Simulation