分析山西省2009年电力装机、经济运行、外送电量情况,总结山西省2009年投产机组及结转工程、国家规划内电源项目、新能源(可再生能源)发电项目、电网建设、小火电机组关停、电力建设专项审计调查等工作,介绍2010年山西电力建设的主要目标。
This paper analyses the situation of electricity installation, economic operation and power transmission of Shanxi province in 2009. Some issues in 2009 are summarized, including production units and carry-over projectS, power source projects within the national planning, renewable power generation projects, grid construction, the shutting down of small thermal power units, special audit investigation of electric power construction and so on. What is more, the main objective of Shanxi electric power construction of 2010 is introduced.
出处
《山西电力》
2010年第2期65-67,69,共4页
Shanxi Electric Power
关键词
电力建设
电力装机
运行情况
关停小火电
电力投资
electric power construction
electricity installation
operation situation
shut down small thermal power units