期刊文献+

双筒流变仪中Burger流体流动分析 被引量:1

Analysis of Burgers fluid flow in double cylinder rheometer
原文传递
导出
摘要 该文研究了双筒流变仪中Burger流体非稳态流动,应用Hankel变换得到了双筒流变仪中Burger流体非稳态流动的解析解,据此可分析环管内旋转速度和切应力分布与变化特征。利用Laplace变换数值反演Stehfest方法分析了流变仪中Burger流体的动态特征,结果表明速度场和应力场分布对Burger流体参数非常敏感。Navier-Stokes流体的著名解,像Maxwell流体、二阶流体和Oldroyd-B流体的解都是本文解的特殊情况. This paper deals with some unsteady transient flows of a Burger's fluid in a double cylinder rheometer. Analytical solution for some unsteady flows of Burger's fluid in a double rheometer was given by using Hankel transform. The formulae can be used to analyze the behavior of unsteady flow of Burgers' fluid in a double cylinder rheometer. The characteristic of Burger's fluid flow in the rheometer was analyzed by using Stehfest method of the numerical inversion of Laplace transform. The result indicates that the more sensitive is the dependence of velocity and stress on the value of Burger's fluid parameter. The well known solutions for a Navier-Stokes fluid,as well as those corresponding to a Maxwell fluid, a second grade and an Oldroyd-B one fluid, appear as limiting cases of our solutions.
出处 《水动力学研究与进展(A辑)》 CSCD 北大核心 2010年第2期183-189,共7页 Chinese Journal of Hydrodynamics
基金 国家自然科学基金(40874044) 山东省自然科学基金(Y2007F13)资助
关键词 Burger流体 双筒流变仪 LAPLACE变换 解析解 Burger's fluid double cylinder rheometer laplace transform analytical solution
  • 相关文献

参考文献6

二级参考文献17

共引文献32

同被引文献15

  • 1王兆会,马兆忠.热采井温度对套管性能的影响及预应力值计算方法[J].钢管,2007,36(4):24-27. 被引量:27
  • 2PENG Su-ping, FU Ji-tong, ZHANG Jin-cai. Borehole casing failure analysis in unconsolidated formations: A case study[J]. Journal of Petroleum Science and Engi- neering, 2007, 59(3-4): 226-238.
  • 3LI Zi-feng. Casing cementing with half warm-up for thermal recovery wells[J]. Journal of Petroleum Science and Engineering, 2008, 61(2-4): 94-98.
  • 4NIGEL L, SANTIAGO M, PHILLIP P. Casing damage in a tectonic setting: evaluation, impact and manage- ment[C]. IADC/SPE Drilling Conference (IADC/SPE) 74560, Dallas, USA, 2002.73-85.
  • 5CAREYA J W, SVECB R, GRIGGB R, et al. Wellbore integrity and CO2-brine flow along the casing-cement microannulus[J]. Energy Procedia, 2009, 1(1): 3609- 3615.
  • 6WOJTANOWICZ A K, ZHOU De-sheng. Shallow casing shoe integrity interpretation techniqu[J]. Journal of Petroleum Science and Engineering, 2010, 70(3-4): 183-190.
  • 7ZHAO Zeng-xin, GAO De-li. Casing strength degrada- tion due to torsion' residual stress in casing drilling[J]. Journal of Natural Gas Science and Engineering, 2009, 1(4-5): 154-157.
  • 8LU Shuan-lu, HAN Yong, Q1N Chang-yi, et al. Ana- lysis of well casing connection pullout[J]. Engineering Failure Analysis, 2006, 13(4): 638-645.
  • 9练章华.地应力与套管损害机理[M].北京:石油工业出版社,2009.94-95.
  • 10BARLET-GOUEDARD V, RIMMELE G, PORCHE- RIE O, et al. A solution against well cement degrada- tion under CO2 geological storage environment[J]. International Journal of Greenhouse Gas Control, 2009, 3(2): 206-216.

引证文献1

二级引证文献11

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部