期刊文献+

钢轨压焊顶锻变形热/力模拟研究

Investigation in thermal and mechanical simulation of upset deformation on rail butt welding
下载PDF
导出
摘要 采用美国先进的Gleeble-2000热模拟试验机,对高速铁路轨道用U71Mn钢轨的对焊顶锻变形过程进行了热力模拟试验。研究了不同加热条件下,钢轨顶锻所需压力的大小;探索了在相同加热条件下,钢轨钢在顶锻变形过程中的顶锻量、顶锻速度以及带电顶锻时间对接头焊接质量的影响规律。实验结果为合理制定钢轨对焊工艺,有效控制焊轨质量,为列车安全运行提供了试验数据和理论依据。 The thermal and mechanical simulation experiment on rail steel(U71Mn) butt welding in the process of upset formation is done via the advanced American Gleeble-2000 simulator. The upset pressure of rail is studied when the heat-condition is different and the regulation of welding quality which is related to upset length ,upset speed and upset electrified time is investigated when the heat-condition is the same.The results can provide scientific foundation for preparing procedure and improving quality control on rail welding, ensuring the train run safely.
出处 《电焊机》 北大核心 2010年第4期21-24,共4页 Electric Welding Machine
关键词 钢轨 对焊 顶锻变形 热力模拟 rail butt welding upset deformation thermal and mechanical simulation
  • 相关文献

参考文献5

二级参考文献9

共引文献23

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部