天津钢管100t电炉除尘工程 被引量:1

THE DUST REMOVAL PROJECT OF THE 100 t ELECTRIC ARC FURNACE IN No.2 STEELMAKING PLANT OF TIANJIN STEEL TUBE
原文传递
导出
摘要 天津钢管100t电炉除尘项目为适应电炉的操作及提高烟气捕集率,减少除尘系统烟气量,采用第四孔捕集一次烟气,电炉跨屋顶罩捕集二次烟气的组合方式,间接水冷,间接风冷,混风降温的干法除尘,效果显著。针对此工程,分析除尘系统在设计、施工、运行中需要注意的关键技术,并对除尘工艺的发展作了前瞻性的探讨。 For adapting the operation of the electric arc furnace,increasing the catching rate of fume and reducing the fume amount of the dust removal system,the combination of catching the primary exhaust gas from the fourth hole and catching the secondary exhaust gas from the roof cover was used in the electric arc furnace plant.The dry dust removal of the indirect watercooling,indirect wind-cooling and mixing wind was also adopted,obvious effect was got.So it was analyzed the key technologies in design,construction and running of the dedusting system.And it was discussed the development of the dust removal technics in the needing attention future.
出处 《环境工程》 CAS CSCD 北大核心 2010年第2期99-101,113,共4页 Environmental Engineering
关键词 电炉除尘 工程 屋顶罩 调速 dust removal by electric arc furnace project roof cover speed-regulating
  • 相关文献

同被引文献4

引证文献1

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部